SEMESTAby Sarana AI

Mine-to-Port Orchestrator — PT ABM (demo)

Live
Tonnage today
42,300/ 48,000 t
On-time to vessel
91%
Cost per tonne
$6.85
Demurrage risk
4 h
Active barges
7/ 12

Workflow Pipeline

Updated just now
Mine FaceOn track
3 sites active
88%
StockpileOn track
61,000 t buffer
70%
HaulingAttention
38 trucks · 6.9 km avg
64%
Barge LoadingOn track
7 barges loading
75%
Port TransferOn track
2 berths
80%
Vessel Load-outAttention
MV-Pacific laycan 18h
55%

Live events

Inject disruption
  • 06:12Site A hit 3,000 t — ahead of plan
  • 05:48BG-04 departed jetty, ETA port 07:30
  • 05:30Haul road Site B wet — speed reduced
  • 05:05MV-Pacific anchored, laycan opens 23:00
  • 04:40Shift handover complete

Barge Allocation Rule

Editable

Logic is configurable by your ops team — no code.

How aggressively to favour vessels at demurrage risk.
0.70
Don't dispatch under this fill ratio.
Cap on opportunistic reroutes.
Flag allocations that exceed this.
Formula preview
score(barge) = 0.70 * demurrageRisk + 0.30 * fillEfficiency
allocate by score desc
  where fill% >= 85
    and reroute <= 40 km
flag if projectedCostPerTonne > $6.50

Values update live as you adjust parameters on the left.